Waferpedia

Comparison ledger

V 93000 DPSversusNextest Magnum 2 X GVLC VP

Advantest V 93000 DPS, Teradyne Nextest Magnum 2 X GVLC VP, side by side. Every value shown is drawn from the cited encyclopedia entries.

Documented as functional equivalents— Same function class: Test & Probe, Unknown[1]
Side-by-side comparison of selected equipment models
Attribute
V 93000 DPSAdvantest
OEMAdvantestTeradyne
CategoryTest & ProbeTest & Probe
Wafer size——
Process node——
Introduced——
Production run——
Lifecycle——
Lifecycle milestones——
Control system——
Generation——
FamilyAdvantest V 93000Teradyne Nextest Magnum
Specifications
ConfigurationAC:[1]—
MBAV8 4S4M B (MCB 8 Units4 SRC + 4 MEAS)[1]—
ACDC PSCabinet Primary Power Supply (3)[1]—
DCDC ACage Secondary Power Supply[1]—
DCDC UCage Secondary Power Supply (3)[1]—
PS800Pinscale 800 MB/S (21)[1]—
MSDPS AMultisite DPS, 8Ch, 8V/4A (4)[1]—
UHC4Ultra High Current DPS[1]—
ACMBAV8 4S4M B (MCB 8 Units: 4 SRC + 4 MEAS)[1]—
InfraACDC PS: Cabinet Primary Power Supply (3); DCDC A: Cage Secondary Power Supply; DCDC U: Cage Secondary Power Supply (3)[1]—
DigitalPS800: Pinscale 800 MB/S (21)[1]—
DCMSDPS A: Multisite DPS, 8Ch, 8V/4A (4); UHC4: Ultra High Current DPS[1]—
Input—208 VAC, 3 Phase, 185 A, 50/60 Hz[2]
Maximum I/O Pins—10,240 pins[2]
ECR Size (per 64 pins)—36 Gb and 72 Gb[2]
RCM Size (per 16 pins)—36 Mb[2]
DBM Size (per APG)—18 Gb and 36 Gb[2]
EBM (per pin)—16Kb data source[2]
Vector Depth—64-128 MV and 128-256 MV[2]
APG Register—24X, 24Y (40 max)[2]
Data Word Width—36 bits (18 DDR)[2]
On-the-fly Timing Sets—31[2]
Total Timing Accuracy—+/- 350 pS[2]
Drive & Compare Levels—-1 V to 6.5 V[2]
VIIH—0 to 12.5V, Selectable pin-by-pin[2]
DPS—1 per 8 pins[2]
DPS Voltage Range—-15 V to +15 V[2]
DPS Current Range—0 to 600 mA in 6 ranges[2]
PMU—1 per 16 pins[2]
PMU Voltage Range—0 to 20 mA in 5 ranges[2]
PTU—10.24[2]
PTU Voltage Range—-1.5 V to +12 V (2 mA)[2]
Input Power—208 VAC, 3 Phase, 185 A, 50/60 Hz[2]
PTU Current Range—0 to 28 mA in 8 ranges[2]
Test Language—C[2]
Test Type—Memory, Logic, and Mixed Mode[2]
Tester Workstation—PC[2]
Operating System—Windows Server 2003[2]

Plan your fab

Building a Test & Probe process? Get a complete equipment list.

Open the fab equipment planner →
Sources (2)Every fact above is drawn from these public sources
  1. [1]inventory listing
  2. [2]inventory listing