Comparison ledger
Applied Materials 0041-26723 Bonded Assembly, EV Group EV 501 Wafer, side by side. Every value shown is drawn from the cited encyclopedia entries.
| Attribute | 0041-26723 Bonded AssemblyApplied Materials | EV 501 WaferEV Group |
|---|---|---|
| OEM | Applied Materials | EV Group |
| Category | Packaging & Bonding | Packaging & Bonding |
| Wafer size | — | Capable of thermo compression, fusion or anodic wafer bonding |
| Process node | — | — |
| Introduced | — | — |
| Production run | — | — |
| Lifecycle | — | — |
| Lifecycle milestones | — | — |
| Control system | — | — |
| Generation | — | — |
| Family | Applied Materials 0041-26723 Bonded Assembly | EV Group EV 501 Wafer |
| Cited variants | — |
|
| Specifications | ||
| Configuration | — | Refurbished[2] |
| Wafer size | — | Capable of thermo compression, fusion or anodic wafer bonding[2] |
| Thickness | — | Max wafer stack thickness 6 mm[2] |
| Bottom side heater | — | 550°C max. in 1°C steps[2] |
| Temperature uniformity | — | ± 1,5 %[2] |
| Bonding capability | — | Capable of thermo compression, fusion or anodic wafer bonding[2] |
| Bond chamber | — | Bond chamber for small pieces up to 150 mm wafers (with correct tooling)[2] |
| Vacuum pump | — | Turbo Pump[2] |
| Power supply | — | High voltage power supply for anodic bonding (additional tooling may be required)[2] |
| Electronics | — | Electronics Rack[2] |
| Control/software | — | Computer & Software[2] |
| Display | — | LCD Monitor[2] |
| Pump | — | Roughing Pump[2] |
| Manual | — | Operations Manual[2] |
| Condition | — | Refurbished[2] |
| Wafer sizes supported | — | 2, 3, 4, 5, 6, 12 inch[2] |
| Max wafer stack thickness | — | 6 mm[2] |
| Bottom side heater max temperature | — | 550°C max.[2] |
| Heater temperature step | — | 1°C steps[2] |
| Roughing pump | — | Roughing Pump[2] |
| High voltage power supply | — | High voltage power supply for anodic bonding (additional tooling may be required)[2] |
| Electronics rack | — | Electronics Rack[2] |
| Computer & software | — | Computer & Software[2] |
Plan your fab
Building a Packaging & Bonding process? Get a complete equipment list.
Open the fab equipment planner →